GPS/MET Reprocessing Schedule

The GPS/MET program staff is in the process of reprocessing much of its historical data, with a set of significantly improved software. After all thirteen periods are processed, GPS/MET intends to publish the data via World Wide Web, CD, and magnetic tape.

The following projected reprocessing schedule is provided for data users who may need certain data items sooner than the fall of 1997. To make a specialized data request, use the feedback form to submit your request.

Abbreviations:

PT
Prime Time -- Period when A/S was off and satellite geometry was good. There are four such periods to date, numbered 1-4 (for historical reasons). Each PT is also a GPT.
GPT
Geometric Prime Time -- Period when satellite geometry was good. These are lettered A-M. The set of GPT's includes the set of PT's as a subset.
FTX
FASTEX Experiment -- Some days are being reprocessed which were not GPTs, but were interesting because they were during the FASTEX experiment period. FTX are numbered 1-3, where FTX 2 is the same as PT4, and FTX 1 and 3 are the periods before and after PT4.
Note: some date ranges are extended here to include interesting adjacent data; for example if A/S remained off after the GPT ended.

Estimated Reprocessing Completion -- Sorted by Data Collection Date

Data PeriodDescriptionLevel 0/1Level 2/3 Neutral atm.Level 2/3 Ionosphere
4/18/1995-5/11/1995PT 1 (= GPT A)Aug 30Sep 6-
6/19/1995-7/11/1995PT 2 (= GPT B)Aug 16Aug 23-
8/11/1995-8/30/1995GPT CSep 24Sep 27-
10/10/1995-11/1/1995PT 3 (= GPT D)Aug 2Aug 9Aug 16
11/24/1995-12/15/1995GPT EOct 1Oct 4-
1/22/1996-2/11/1996GPT FOct 8Oct 11-
3/16/1996-4/06/1996GPT GSep 17Sep 20-
5/7/1996-5/27/1996GPT HOct 15Oct 18-
7/4/1996-7/25/1996GPT IOct 22Oct 25-
8/24/1996-9/14/1996GPT JOct 29Nov 1-
10/19/1996-11/7/1996GPT KSep 10Sep 13Sep 20
12/15/1996-1/5/1997GPT LNov 5Nov 8-
1/6/1997-2/1/1997FTX 1Jul 19Jul 26Aug 2
2/2/1997-2/23/1997PT 4 (= FTX 2, GPT M)Jun 6Jul 12-
2/24/1997-2/28/1997FTX 3Jun 6Jul 12-

Reprocessing Schedule -- Sorted by Reprocessing Date

Reprocessing DateDescriptionDate Collected
Jul 12PT 4 (= FTX 2, GPT M)Feb 1997
Jul 12FTX 3Feb 1997
Jul 26FTX 1Jan 1997
Aug 2Ionosphere, FTX 1Jan 1997
Aug 9PT 3 (= GPT D)Oct 1995
Aug 16Ionosphere, PT 3 (= GPT D)Oct 1995
Aug 23PT 2 (= GPT B)Jun 1995
Sep 6PT 1 (= GPT A)Apr 1995
Sep 13GPT KOct 1996
Sep 20Ionosphere, GPT KOct 1996
Sep 20GPT GMar 1996
Sep 27GPT CAug 1995
Oct 4GPT ENov 1995
Oct 11GPT FJan 1996
Oct 18GPT HMay 1996
Oct 25GPT IJul 1996
Nov 1GPT JAug 1996
Nov 8GPT LDec 1996

Return to GPS/MET home